【首页 Home】【规则查阅 View Rules】 Hello,{{MyName}}{{MyName}}  

帆船赛事村

Sailing Race Village

  
[上一章节 Previous Chapter][回到索引 Back to Rules Index][下一章节 Next Chapter]

APPENDIX H
WEIGHING CLOTHING AND EQUIPMENT

See rule 50. This appendix shall not be changed by the notice of race, sailing instructions or prescriptions of national authorities.

H1

Items of clothing and equipment to be weighed shall be arranged on a rack. After being saturated in fresh water the items shall be allowed to drain freely for one minute before being weighed. The rack must allow the items to hang as they would hang from clothes hangers, so as to allow the water to drain freely. Pockets that have drain-holes that cannot be closed shall be empty, but pockets or items that can hold water shall be full.

H2

When the weight recorded exceeds the amount permitted, the competitor may rearrange the items on the rack and the member of the technical committee in charge shall again soak and weigh them. This procedure may be repeated a second time if the weight still exceeds the amount permitted.

H3

A competitor wearing a dry suit may choose an alternative means of weighing the items.

(a) The dry suit and items of clothing and equipment that are worn outside the dry suit shall be weighed as described above.

(b) Clothing worn underneath the dry suit shall be weighed as worn while racing, without draining.

(c) The two weights shall be added together.

[上一章节 Previous Chapter][回到索引 Back to Rules Index][下一章节 Next Chapter]
网站联系:黄山 Shan Huang,+86 13922119715,shan@wilsonhuang.cn
工信部ICP备案:粤ICP备2024206764号
公安部备案:粤公网安备44010502002780号